RailPros has completed assistance with the design of a new At-Grade Railroad Crossing. The grade crossing has been constructed and is open, interconnected to the traffic signal at Telegraph Road and Hallock Drive and includes a presignal. RailPros is also providing railroad coordination, railroad signal design, crossing design and traffic signal, signing and striping, and track design engineering support for the new Hallock Grade Crossing.
Steve Brandt, Vice President, PM, said, “You guys are like the Google for anything rail.”