MTS Courthouse Station

RailPros provided the final design on the new San Diego Trolley Orange Line Courthouse Station project. We prepared track and station layouts for the relocation of the existing westerly terminus. Some other elements of this project include a new siding track with turnouts and a crossover to join with the new station platform, vehicular traffic control modifications, and modifications to existing traffic circulation as well as utility relocations, drainage, and compliance with new storm water regulations, which are critical components to the project.

more featured projects

Situational Awareness Training and Roadway Worker Protection Training

July 1, 2019

G&W Roadway Worker Protection for Contractors and Turn-Out Inspection Procedures Training

August 24, 2019

Port of Long Beach Construction Inspection and Engineering Standards

August 24, 2019

Amtrak Derailment Investigation Training

August 24, 2019

Connect with the Experts.

LET’S GET MOVING